Again it depends on the type and size of the project. Typically once all paperwork is signed off and the file is briefed into the factory team a typical kitchen may take around 4 – 6 weeks to be made depending on the materials selected (includes time for materials to be ordered and arrive as well as the actual building). Vanities, laundries, entertainment units, study areas and shelving usually take about 2 – 4 weeks depending on the size of the project.
Installation usually takes around 1 – 2 days for standard removal and joinery install. Depending on the trades required for your specific job you should allow another 1-7 days for trades. Stone benchtops, splashbacks and custom shower screens can take up to 14 days from final measure. When preparing for installation the team will take you through the estimated time frames based on your specific job.
When working through a proposal the design team should be able to give you a basic idea of turnaround times based on the size and scope of your project.
New builds tend to be much faster installs overall.